Stick curtain wall plan details second floor is 0 second floor stick curtain wall system 1 second fl 12 0 roof 0 angle bolt glass insulation mullion water proofing flashing rigid slab insulation deck metal beam glazing gask lg.
Curtain wall meets floor detail.
View detail drawings for steelbuilt curtainwall systems from technical glass products.
It is a stick system zone drained and pressure equalized and offers a 50mm sightline with a standard choice of six mullion and six transom depths.
The smr800 curtain wall system has been designed with enhanced thermal performance and to meet current building regulations.
Unitised curtain walling can be installed either from the interior of the building using a beam on the floor above or from the outside using a crane.
The result is a very uniform color among the exterior materials.
Unit tape structural part epdm setting break horizontal wjllion wjllion nsclatec class.
The modules are transported to each floor level lifted to the correct position and installed onto each floor slab.
Brown colored plate glass spans between the mullions and 1 8 thick muntz metal spandrel panels are used at each floor slab.
Unitized proven products and systems that offer the advantage of speed lower field installation costs and significantly improved quality control within a controlled shop environment.
The allowable deflection would then be 144 175 0 823 inches which means the wall is allowed to deflect inward or outward a maximum of 0 823 inches at the maximum wind pressure.
Drainage and ventilation is achieved via the mullion on mullion drained or.
Say a given curtain wall is anchored at 12 foot 144 in floor heights.
These details demonstrate the approach used to construct a copper alloy curtain wall in a historically significant building.
Find all commercial curtain wall drawing details here.
Curtain wall systems must transfer back to floor structure or intermediate framing both their own dead load plus any live loads which consist primarily of positive and negative wind loads but might also include a snow load applied to large horizontal areas seismic loads maintenance loads and others.
The installation team must be safely connected to the structure via a harness.